Robert Mills 6407
Woodhaven St. Pearland, TX 77584 | Cell:
832-335-0182 | Email: rmills09@yahoo.com Summary
Twenty five years of
experience in the Engineering and Construction Project Controls arena.
Expertise in Planning/Scheduling using Primavera P6 ver.8. Assignments have
included home office and field projects, revamps, and grassroots projects.
Conducted EPC interactive scheduling sessions with discipline leads and
project management personal. Produced project schedules, histograms,
look-ahead schedules, and what if schedules. Developed generic
engineering EPC logic diagrams for new project use. Project types have
included Petrochemical, Pulp & Paper, Oil Refining, and Power. Professional
Experience
Jacobs Engineering – (February
2011 – April 2015) – Houston, TX Senior
Planner/Scheduler Worked on various projects EPC, Downstream,
Upstream, Multi Projects Group. Worked in both client and Jacobs Citrix P6
databases. Conducted Interactive planning/scheduling sessions. Preformed
schedule progress reporting, resource loading and histograms. · Lead Planner/Scheduler assigned to the Conoco/Phillips
Upstream program. · Lead Planner/Scheduler in the Multi Projects Group. · Sr. Planner/Scheduler Assigned to the Flint Hills program.
· Lead Planner/Scheduler assigned to the Chevron/Philips
Steam project. · Field Planner/Scheduler assigned to the BP Projects Group at the
Texas City Refinery. Responsible for field planning and scheduling
activities. Currie & Brown – (February
2010 – February 2011) – Houston, TX Project Controls Consultant · Assigned to Seawell America to provide
Project Controls expertise in developing resource loaded schedules, progress
measurement techniques and procedures. With the combining of in house
projects to determine manpower requirement with the acquisitions of new
incoming projects. As well as tracking ongoing projects. Utilizing Primavera
P6 ver.7 and a Seawell Oracle time keeping program. Fluor Daniel Corp. – (February
2007 – June 2009) – Houston, TX Senior Planner / Scheduler ·
Valero CCR Project.
1.2B. Responsible for the development and the monitoring of the FEED
schedule, and development of a Level III EPC schedule utilizing Primavera 3.1
and 5.0. Worked with discipline leads, procurement and construction personal. Foster Wheeler USA –
(September 2006 – December 2007) – Houston, TX Lead Planner / Scheduler ·
BP OCC Delayed Coker
Project. Responsible for the development and monitoring of the FEED and EPFC
schedules utilizing Primavera P3, and upgrading to e/c 5.0. Intergraded the
schedule with other contractor’s schedules involved in the project. Worked
with discipline leads for schedule development and progressing. KBR - Halliburton – (May
2005 – April 2006) – Houston, TX Construction Planner /
Scheduler ·
Responsible for
developing a Level II construction schedule with the construction management
team and resource load a million man-hours. Produced what-if schedules,
histograms and curves. An estimated $2.5 billion dollar Algerian LNG project. Valero Energy Corporation -
(November 2003 – February 2005) – San Antonio, TX Project Controls Engineer ·
I was contract with
Maverick Engineering, Victoria, TX. Contracted to Valero Energy Corporation
Headquarters in San Antonio, TX. Assigned to the Pipeline & Terminals
division providing Project Controls support to management on multiple
projects. I scheduled using MS Project and did the cost in SAP. Worked with
the Engineering Director to provide a weekly report for upper management. The
report included schedules, cost reports, graphs, and charts. S & B Engineers and
Contractors - (February 1998 - July 1999) - Houston, TX Project Controls
Engineer ·
Developed EPC/CPM
integrated Primavera project schedules for various types of projects.
Including engineering and construction man-hour histograms, cost projections,
and cash flow curves. Worked with discipline leads, procurement and
construction personal. Dow Chemical Company -
(November 1996 - February 1998) - Houston, TX Project Control Lead ·
A 135M Polypropylene
grassroots project at the Freeport, Texas plant. Responsibilities included
development and tracking of EPC/CPM Primavera schedules, resource loading /
staffing curves. Worked with all discipline leads and plant personal. Bechtel Corporation -
(October 1988 - August 1996) - Houston, TX Senior Project Controls Engineer -
Worked various long range projects. · Tampa Electric Co., Polk Power Station
Project, 260 megawatt Integrated Coal Gasification Combined Cycle grassroots
power plant. Responsible for Primavera developed EPC/CPM schedules, manpower
loading, histograms, progress and performance tracking with written analysis. · Mobil Aramchem MTBE facility. Responsible
for Primavera developed EPC schedules, manpower loading, histograms, progress
and performance tracking with written analysis. · Lyondell Petrochemical Co., Benzene NESHAP
compliance wastewater project. Developed Primavera manpower loaded project
schedules with written progress analysis. · Union Carbide Corp., Taft. LA, Ethylene
Oxide Unit expansion and conversion project. Developed Primavera manpower
loaded project schedules. ·
Union Carbide Corp.,
Olefins Furnace Heater project. Responsible for project schedules. Jacobs Engineering -
(January 1988 - October 1988) - Baton Rouge, LA Project
Planning/Scheduling Engineer ·
Responsible for
development and maintaining various project schedules. Petrochemical, Oil
Refining, Re-vamps/Upgrades for Exxon, Union Carbide and Gigi
Pharmaceuticals. Schedule software included Open Plan and Primavera P3. Brown & Root USA -
(January 1987 - December1987) - Pensacola, FL Field
Planner/Scheduler · Champion Paper Corp. Converted brown paper
manufacture to fine white paper process, Bleach Plant, Chemical Preparation
Bldg. and Wood Chip Yard. Developed and progressed 90-day look-ahead
construction schedules. Tracked craft man-hours. Computer Skills · Primavera P6, ver. 8.34 · Various company specific Progress
Measurement Systems, both home office and field. Education and Technical
Training ·
Primavera 6.2 Certified &
Training, Basic & Advanced ·
Bechtel Corp. -
Project Controls training course and Technical Services training. ·
Houston Community
College - Business 1974 - 1976 References: ·
Jeff Nosier, Jacobs Engineering, Project Controls Manager,
Cell: 281-728-0095, Email: jeff.noser@jacobs.com
·
Jim Malone, Jacobs Engineering, Project Controls Manager.
Cell: 832-330-2783, Email: jim.malone@jacobs.com
· Jim Heffner, CBI, Phone: 832-513-1795, Cell:
281-630-9435 Email: jheffner@CBI.com
Page 1 of 2 April 2015 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Beginner |
|
|
|